Prepare
Evidence and remediation programme
Correct the technical gaps and build the evidence needed to defend them.
In your situation
What the scoping will need to take into account.
Ability to establish
Drive corrections through to their proof of closure.
An action is only considered complete once its owner, its dependencies, its exit criterion and the expected evidence are all made explicit.
Subject of the work
Corrections progress through evidence of closure, not through a declared percentage.
How it actually unfolds
Organise the review before mobilising the teams.
Programme driven by a prioritised plan, remediation cycles and evidence reviews through to the agreed closure criteria.
Owners implement the corrections; iKNSA structures the decisions, verifies the outputs and keeps dependencies visible.
Qualified findings, risks, client commitments, affected architecture, available capacity and starting evidence.
Pace follows criticality, technical dependencies and client deadlines; progress is measured by demonstrated closure.
Review
Handle each gap with an owner and a verifiable resolution.
Prioritise according to client commitments
The plan starts with the gaps that put a client engagement at risk or block an imminent commercial decision.
Correct documentation, IAM, platform or operations
Documentary and technical corrections are coordinated to prevent a policy announcing what the platform does not actually deliver.
Assign actions and dependencies
Each action retains its dependencies, its decision-making authority and the criterion by which its completion can be verified.
Verify closure criteria
The closure review examines the result produced and states the limitations that remain after the correction.
Handover
The evidence that substantiates real progress.
The plan gives each gap a priority, an owner, prerequisites and a checkable closure criterion.
The procedures, configurations or operational changes made are linked to the gap they are intended to correct.
The file brings together the results produced after correction, together with their source, population and remaining limitations.
Each verification specifies what was replayed, on which sample and why the result does — or does not — allow the gap to be closed.
Scoping the engagement
Start from known gaps to build verifiable closures.
The existing gap register, even if incomplete, makes it possible to build the correction batches, dependencies and closure criteria to be verified.

